PlatformOrders
Where projects come to life

Order Management

Create an order, assign the manager who owns it, plan the workforce and resources it needs, and track every permit and material to completion — all from one order details page.

Order #1043 · Track renewalActive
Service
Track works
Manager assigned
Requirements
0/7
2 in progress
PRoad-closure permitIn progress
MRail clips supplyCompleted
OSite survey sign-offPending
Step one

Start with the order, capture the essentials.

Admins create an order with the key details up front — so everything that follows is anchored to a single, well-defined project record.

  • Order ID and service category
  • Client information and contact
  • Site address and other project details
New order
Order ID#1043
ServiceTrack renewal
ClientDB Netz AG
AddressSection 12, Hauptlinie
The order details page

Everything an order needs, in one place.

Once an order exists, its details page becomes the hub: who's responsible, what crews and machines it needs, what has to be in place before work starts, and every related file.

Order Manager

Assign the person responsible for overseeing the whole project — clear ownership from day one.

Single ownerAccountability

Workforce Schedules

Define the shift period (start/end dates and times) and the required roles — e.g. General Labor ×6, Electrician ×2.

Shift periodRequired roles

Resource Schedules

Plan the machines, vehicles and equipment a project will use — from cranes to concrete mixers to generators.

MachinesVehiclesEquipment

Requirements

Track everything that must be in place — each requirement has attached files, a type, and a live status.

Permit / LicenseMaterial / SupplyOther

Attachments

Upload general files related to the order — drawings, contracts, photos — kept right alongside the project.

PDFImages

Schedules View

Open the Gantt-style timeline to see all planned workforce and resources on the project at a glance.

Gantt timelinePer-shift chat
Go to Scheduling
Resource planning

Plan the iron, not just the people.

Resource schedules capture the planned usage of every kind of asset a construction project relies on — grouped into three clear categories.

🏗️ MachinesCrane, Excavator, Wheel Loader
🚛 VehiclesPickup, Concrete Mixer, Dump Truck
⚙️ EquipmentAir Compressor, Generator, Welding Unit
Resource schedule
🏗️Crawler CraneMon–Wed
🚛Dump Truck ×2Thu–Fri
⚙️GeneratorAll week

Requirements never get forgotten

Every requirement belongs to one of three types and carries its own files and tracking status — so permits, materials and sign-offs move from start to finish in plain sight.

PendingIn ProgressCompleted

Run every project as a managed order.

See order management mapped to a real project in a 30-minute walkthrough.